...

EL Sewedy Electric : Project Story

Project Details

PROJECT : EL Sewedy Electric DETAILS QUANTITY : 7000 S.M AREA : 10 OF Ramadan COLOR : Light grey 7040 SYSTEM : Coating / self leveling 2 mm SUPPLIER : BASF

BEFORE

SURFACE PREPARATION

Surface preparation is one of the most important factors for the success of Epoxy floor, So FLOOR IN company is always interested in using the best and latest types of machines that achieve this according to the requirements of the floor.
MOISTURE LEVEL
Surface moisture is measured before implementation using measuring devices so that it does not exceed 4%.

PRIMER

A layer of epoxy primer was applied to increase and strengthen the cohesion of the concrete surface, as the primer is one of the very important steps in implementing the stages of epoxy floors.

PUTTY

A layer of epoxy putty was applied to level the concrete surface, prepare the floors for finishing, and treat any worn parts.

FINISHING

The floors are completely finished with self-leveling epoxy in the customer’s preferred colors, as there are many colors available for epoxy flooring systems.

BEFORE

AFTER

Other Projects

Scroll to Top