CHIPSY : Project Story

pngegg 9 - FLOOR IN - Industrial Epoxy Company

Project Details

PROJECT : CHIPSY
QUANTITY : 1500 S.M
AREA : OUBOR
COLOR : C1L1 / R7012
SYSTEM : EPOXY WALL
SUPPLIER : BODO MOLLER

Image 023 - FLOOR IN - Industrial Epoxy Company

BEFORE

When visiting the work site by FLOOR IN Company engineers.

We found some comments on the current floors and joints.

Image 024 - FLOOR IN - Industrial Epoxy Company
MOISTURE LEVEL

Surface moisture is measured before implementation using measuring devices so that it does not exceed 4%.

Image 025 - FLOOR IN - Industrial Epoxy Company

PRIMER

A layer of epoxy primer was applied to increase and strengthen the cohesion of the concrete sur- face, as the primer is one of the very important steps in implementing the stages of epoxy walls.

Image 026 - FLOOR IN - Industrial Epoxy Company

A layer of epoxy primer was applied to increase and strengthen the cohesion of the concrete sur- face, as the primer is one of the very important steps in implementing the stages of epoxy walls.

Image 026 - FLOOR IN - Industrial Epoxy Company

PUTTY

A layer of epoxy putty was applied to level the con- crete surface, prepare the walls for finishing, and treat any worn parts.

Image 027 - FLOOR IN - Industrial Epoxy Company

FINISHING

The walls are completely finished with Coating epoxy in the customer’s preferred colors, as there are many colors available for epoxy wall systems.

Image 028 - FLOOR IN - Industrial Epoxy Company

BEFORE

Image 024 - FLOOR IN - Industrial Epoxy Company

AFTER

Image 031 - FLOOR IN - Industrial Epoxy Company
Scroll to Top