...

CHIPSY : Project Story

Project Details

PROJECT : CHIPSY QUANTITY : 1500 S.M AREA : OUBOR COLOR : C1L1 / R7012 SYSTEM : EPOXY WALL SUPPLIER : BODO MOLLER

BEFORE

SURFACE PREPARATION

Surface preparation is one of the most important factors for the success of Epoxy floor, So FLOOR IN company is always interested in using the best and latest types of machines that achieve this according to the requirements of the floor.
MOISTURE LEVEL
Surface moisture is measured before implementation using measuring devices so that it does not exceed 4%.

PRIMER

A layer of epoxy primer was applied to increase and strengthen the cohesion of the concrete sur- face, as the primer is one of the very important steps in implementing the stages of epoxy walls.

PUTTY

A layer of epoxy putty was applied to level the con- crete surface, prepare the walls for finishing, and treat any worn parts.

FINISHING

The walls are completely finished with Coating epoxy in the customer’s preferred colors, as there are many colors available for epoxy wall systems.

BEFORE

AFTER

CHIPSY : Project Story

Read More →
Scroll to Top